<cite id="bjpui"><dl id="bjpui"><th id="bjpui"></th></dl></cite>
  • <meter id="bjpui"><sup id="bjpui"><ins id="bjpui"></ins></sup></meter>
        <style id="bjpui"><li id="bjpui"></li></style>

      1. 亚洲国产成人久久综合三区,同性男男黄gay片免费,少妇无码AV无码专区,国产在线高清视频无码,国产精品白嫩初高生免费视频,色综合中文综合网,亚洲国产精久久久久久久春色,97久久精品无码一区二区
        CN

        Debinding furnace

        Current position:Home > Products > Debinding furnace

        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter

        Vacuum debinding furnace technology parameter

        The alternate type gas inlet and outlet,effective gas uniform distribution,negative pressure removal of binder function.

        Introduction

        •   1.Main function
            ——Vacuum remove the binder function
            ——The alternate type gas inlet and outlet,effective gas uniform distribution,negative pressure removal of binder function.
            2.Technology index
            Material loading size:300×300×600mm
            Design temperature:700℃
            Max.working temperature:800℃
            Heating power:30KW(10KW*3)
            Total power:40KW
            Binder removing:paraffin,rubber,tar
            Temperature uniformity:±10℃;
            Temperature speeding:from 30℃to 700℃,the speed is 8℃/minute in the condition of full loading.
            Cooling speed:the cooling time is less than 5h from 750℃to 80℃in the condition of full loading.
            Rated voltage:380V(±10%),50HZ
            Ultimate vacuum:≤20 Pa
            Pressure rise:≤5Pa/h
            3.Structure feature
            a)The furnace structure is horizontal type single door to open,the hearth adopts superior quality of refractory steel(Cr25Ni20);
            b)The hearth is cylinder structure,with good atmosphere uniformity in the hearth;
            c)The furnace door adopts double layer water cooling structure;
            d)Alternate gas inlet and outlet to remove the paraffin with good paraffin removal uniformity.
            e)The heater adopts nickel chromium resistance wire,composing by 3 independent heaters.
            f)The temperature uniformity of the product loading area can be fully guaranteed by adopting the three-point temperature control method of the front and rear distributed branch thermocouples.
            g)The wax discharge pipeline has heating device and no forming collecting;
            h)The furnace is equipped with a roller track and a special graphite loading boat supporting plate,which is convenient to load and unload.
            4.Main element

          Serial no.

          Name

          Material

          QTY

          1

          The hearthincluding water cooling furnace door and gas charging system

          Cr25Ni20

          Thickness 6-8mm

          1set

          2

          The furnace body

          Q235A

          1set

          3

          Collecting device

          Q235A

          1set

          4

          The heater

          Cr20Ni80

          3 groups

          5

          The thermal insulation chamber

           

          1set

          6

          The draught fast cooling system

           

          1set

          7

          Vacuum system

          2H-30+150 roots pump

          1set

          8

          The thermocouple

          “K” type

          3pcs

          9

          Temperature control

          FP93

          3pcs

          10

          Electric element

          CHINT

          1set

          11

          Control cabinet

          MCGS touch screen

          1set

          12

          PLC

          Delta PLC

          1set

          13

          Control system

          Including cable

           

          14

          The mechanical

          Including  spare parts and paint.

           

          15

          Management service

           

           

          16

          Installation and debugging

           


            The delivery time:about 90 days after confirming to receive the deposit.


        Contact us

        *
        *
        Click the refresh verification code
        *

        Product center

        • +8618674387888
        • 0731-28212882
        • nth@ntdzkj.com
        WeChat
        Changsha Nuotian Electric Heating Technology Co., Ltd   The business license   Map
        Technical support:Hnjing

        Phone

        18674387888

        WeChat

        WeChat

        WeChat

        WeChat

        WeChat

        WeChat

        Mobile

        Mobile

        Mobile

        Top

        WeChat

        WeChat

        Contact us:18674387888

        主站蜘蛛池模板: 强奷漂亮人妻系列老师| 国产精品人成在线播放蜜臀| 免费观看全黄做爰大片国产| 欧美激情内射喷水高潮| 国产精品久久久一区二区三区| 久久精品99国产精品亚洲| 亚洲av日韩av中文高清性色| 婷婷丁香五月深爱憿情网| 蜜臀一区二区三区精品免费| 国产成人亚洲综合色婷婷秒播| 欧美巨大极度另类| 亚洲av午夜福利大精品| 人人妻人人做人人爽夜欢视频 | 丰满人妻熟妇乱又仑精品| 国产成人综合色视频精品| 亚洲中文字幕一区二区| 鲜嫩高中生无套进入| 亚洲精品中文字幕在线观| 男女爽爽无遮挡午夜视频| 亚洲AV成人片不卡无码| 国产伦精品一区二区亚洲| 挺进粗大尤物人妻中文字幕| 日区中文字幕一区二区| 国产又色又爽无遮挡免费动态图| 白嫩人妻精品一二三四区| 久久午夜无码鲁丝片直播午夜精品| 日韩一区二区三区在线观院| 欧美成本人视频免费播放| 成人免费A级毛片无码片2022| 欧美激情一区二区| 国产一级精品毛片基地| 污网站在线观看视频| 日韩av影院在线观看| 国厂精品114福利电影免费| 日韩在线视频线观看一区| 人妻影音先锋啪啪AV资源| 色综合久久夜色精品国产| 九九综合va免费看| 久久国产精品老人性| 淳化县| 日本一区二区精品色超碰|