<cite id="bjpui"><dl id="bjpui"><th id="bjpui"></th></dl></cite>
  • <meter id="bjpui"><sup id="bjpui"><ins id="bjpui"></ins></sup></meter>
        <style id="bjpui"><li id="bjpui"></li></style>

      1. 亚洲国产成人久久综合三区,同性男男黄gay片免费,少妇无码AV无码专区,国产在线高清视频无码,国产精品白嫩初高生免费视频,色综合中文综合网,亚洲国产精久久久久久久春色,97久久精品无码一区二区
        CN

        Debinding furnace

        Current position:Home > Products > Debinding furnace

        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter
        • Vacuum debinding furnace technology parameter

        Vacuum debinding furnace technology parameter

        The alternate type gas inlet and outlet,effective gas uniform distribution,negative pressure removal of binder function.

        Introduction

        •   1.Main function
            ——Vacuum remove the binder function
            ——The alternate type gas inlet and outlet,effective gas uniform distribution,negative pressure removal of binder function.
            2.Technology index
            Material loading size:300×300×600mm
            Design temperature:700℃
            Max.working temperature:800℃
            Heating power:30KW(10KW*3)
            Total power:40KW
            Binder removing:paraffin,rubber,tar
            Temperature uniformity:±10℃;
            Temperature speeding:from 30℃to 700℃,the speed is 8℃/minute in the condition of full loading.
            Cooling speed:the cooling time is less than 5h from 750℃to 80℃in the condition of full loading.
            Rated voltage:380V(±10%),50HZ
            Ultimate vacuum:≤20 Pa
            Pressure rise:≤5Pa/h
            3.Structure feature
            a)The furnace structure is horizontal type single door to open,the hearth adopts superior quality of refractory steel(Cr25Ni20);
            b)The hearth is cylinder structure,with good atmosphere uniformity in the hearth;
            c)The furnace door adopts double layer water cooling structure;
            d)Alternate gas inlet and outlet to remove the paraffin with good paraffin removal uniformity.
            e)The heater adopts nickel chromium resistance wire,composing by 3 independent heaters.
            f)The temperature uniformity of the product loading area can be fully guaranteed by adopting the three-point temperature control method of the front and rear distributed branch thermocouples.
            g)The wax discharge pipeline has heating device and no forming collecting;
            h)The furnace is equipped with a roller track and a special graphite loading boat supporting plate,which is convenient to load and unload.
            4.Main element

          Serial no.

          Name

          Material

          QTY

          1

          The hearthincluding water cooling furnace door and gas charging system

          Cr25Ni20

          Thickness 6-8mm

          1set

          2

          The furnace body

          Q235A

          1set

          3

          Collecting device

          Q235A

          1set

          4

          The heater

          Cr20Ni80

          3 groups

          5

          The thermal insulation chamber

           

          1set

          6

          The draught fast cooling system

           

          1set

          7

          Vacuum system

          2H-30+150 roots pump

          1set

          8

          The thermocouple

          “K” type

          3pcs

          9

          Temperature control

          FP93

          3pcs

          10

          Electric element

          CHINT

          1set

          11

          Control cabinet

          MCGS touch screen

          1set

          12

          PLC

          Delta PLC

          1set

          13

          Control system

          Including cable

           

          14

          The mechanical

          Including  spare parts and paint.

           

          15

          Management service

           

           

          16

          Installation and debugging

           


            The delivery time:about 90 days after confirming to receive the deposit.


        Contact us

        *
        *
        Click the refresh verification code
        *

        Product center

        • +8618674387888
        • 0731-28212882
        • nth@ntdzkj.com
        WeChat
        Changsha Nuotian Electric Heating Technology Co., Ltd   The business license   Map
        Technical support:Hnjing

        Phone

        18674387888

        WeChat

        WeChat

        WeChat

        WeChat

        WeChat

        WeChat

        Mobile

        Mobile

        Mobile

        Top

        WeChat

        WeChat

        Contact us:18674387888

        主站蜘蛛池模板: 91网站在线看| 蜜臀av一区二区精品字幕| 国产午夜精品理论大片| 国产精品午夜福利片国产| 日韩精品成人一区二区三区| 亚洲 日韩 国产 制服 在线| 精品国产三级a∨在线欧美| 国产高清在线精品一区不卡| 亚洲午夜爱爱香蕉片| 欧美激情一区二区三区成人| 麻豆一区二区三区精品蜜桃| 亚洲国产成人av毛片大全| 韩国午夜福利片在线观看| 深夜福利资源在线观看| 人妻av中文字幕无码专区| 久久99国产亚洲高清观看首页| 一级片一区二区中文字幕| 长寿区| av在线播放国产一区| 免费AV片在线观看网址| 欧美肥老太牲交大战| 美女一区二区三区在线观看视频 | 欧洲精品色在线观看| 亚洲日韩性欧美中文字幕| 亚洲精品宾馆在线精品酒店| 99久久免费精品色老| 女人扒开的小泬高潮喷小| 噜噜综合亚洲av中文无码| 精品国产欧美一区二区三区在线| 秋霞人妻无码中文字幕| 介休市| 久久精品一区二区日韩av| 亚洲精品一区二区制服| 亚洲第一区二区国产精品| 爱性久久久久久久久| 福利一区二区在线观看| 另类专区一区二区三区| 久久精品无码一区二区小草| 超碰成人精品一区二区三| 国产av成人精品播放| 91老熟女老人国产老太|